Global Switch required a large high reliability emergency generating plant which would provide power if a mains power failure occurred. The standby power equipment is capable of synchronising with the grid to ensure immediate changeover between the grid and the plant without loss of supply.
Global Switch utilised the broader skill set of TSF from design through to component procurement – installation. The end solution involved the following components: